Roofing

During the Summer of 2009 we managed to arrange for the very old roof tiles to be removed, a layer of insulation material applied and the tiles replaced. In addition, we had the house painted and the Atelier developed.

 

More in this category: « Developments Atelier »
CfR

Bridge House +44(0)1865 858540. Contact us here.

Copyright © 2017 Bridge House. All Rights Reserved.